          Rates, Norms & Durations

          681
          What is needed to come up with a production rate?

          A duration of time, the manhours involved, and an amount of work produced?

          This section is here to document this.  What information do you have that you can share?

          Comments

          MEP Productivity

          Hello sir, If you have any data related to MEP activities productivity rates for gulf countries, request you to kindly share on nimish93@gmail.com Regards, Nimish R Swami

          Metsec output rates

          Hi, Has anyone got any information of Metsec output rates please

          MEP PRODUCTIVITY rate reference

          MEP productivity rate norms::

          Does anyone know where to get the Productivity rate of MEP work that trust worthy and can be used as reference to support the duration calculation. 

          greatly appreciate,

          pisan_osk@hotmail.com

          Manual Rates

          Hi,

          It seems that the most of the rates here are equipment rates. do you have any rates for manpowered activities (e.g. manual excavation)

          Productivity rates for "Civil Infra. and Oil & Gas Projcts

          Dear Friends,

          I need the productivity rates for "Civil Infrastructure and Oil & Gas Projcts" of Middle East Countries. Any one can help ? Please send the excel/word sheet to my e-mail id:

          ramanannagamani@gmail.com

          Thanks.

          Ramanan

          Drainage outputs

          looking at the drainage outputs on here they don't seem to be that reliable? does anybody have an excel spreadsheet they would be able to send with some general drainage outputs?

          ManPower Productivity Norms for MEP

          hi,

          Anyone having Manpower productivy norms excel file for MEP(Gulf), it will be very helful to me.

           

          e-mail: hariveerendra@gmail.com

          Drainage outputs

          I am struggling to see any logic behind the productions per hour on the drainage?

          33m per hour for 150mm drainage in runs exceeding 30m or greater is impossible - unless installed via trenchless methods!

          I calculate my drainage productions to include dig, bed and surround, pipe laying and backfilling compacting in accordance with the specification and would never price on more than 30 - 35m per DAY for a 150mm UPVC pipe at a depth not exceeding 1m.

          What do the productions on here realte to and what do they include?

          Drainage outputs

          I am struggling to see any logic behind the productions per hour on the drainage?

          33m per hour for 150mm drainage in runs exceeding 30m or greater is impossible - unless installed via trenchless methods!

          I calculate my drainage productions to include dig, bed and surround, pipe laying and backfilling compacting in accordance with the specification and would never price on more than 30 - 35m per DAY for a 150mm UPVC pipe at a depth not exceeding 1m.

          What do the productions on here realte to and what do they include?

          Contact JEPM LLC at 409-457-7725

          What geographical location is labor being executed? (remote/local port)

          What is the weather conditions?

          What type of industry?

          Other particulars or need; Are there readily available resource (MP & DFL Equip/Consumables) ?

          Please feel free to contact me at your convenience. 

          Once we come into mutual agreement, I will produce the needed excel loaded unit rates for your project/s need/s.  Based on execution industry actuals.

          Best regard,

          JEPM LLC

          Project Controls Engineer SME

          Jacob Armstrong

          409-457-7725

          Project Controls SME

          Are you in need still?

          Jaocb Armstrong JEPM LLC  409-457-7725

           

          Ya, I am waiting for

          Ya, I am waiting for comments. If you can give some feedback/ comments, it will greatly be useful.

          Thanks/Regards,

          Santhosh

          Impact of crew size and composition on productivity

          Ya, I am waiting for comments. If you can give some feedback/ comments, it will greatly be useful.

          Thanks/Regards,

          Santhosh

          Project Controls SME

          Are you in need still?

          Jaocb Armstrong JEPM LLC  409-457-7725

          Impact of crew design (crew size and composition)on productivity

          Hi all,

          Can you comment on impact of crew design, i.e crew size and composition on productivity?

          Thanks,

          Santhosh

          Construction labour rates

          Dear all experts;

          This data is very useful for me and thank you all. But i need construction labour rates as an excel file. If somebody has it and sen me i will very be thankful. Also can you please give a book advise for this issue.

          Thank you all.

          efe.gurkan@hotmail.com

          productivity rates

          Dear all experts,

           

          I need the productivity rates for Oil & Gas Project - Construction Trade like Sand Blaster, Fireproofer, Spray Painter, Scaffolder, Sheet Metal Fitter, Insulators and Welder.

          I will be very thankful if excel file or PDF file of all production rates can be shared on my email address: sukh_shrestha@hotmail.com

          Thank You

          Productivity

          Can i get the production rate dia Inch for CHW pipes for example 20" pipe one joint require 3 hours .. Etc or if there is a formula followed to calculate the same knowing that its all sch STND

          Crew structure

          Thank you deeply, for the great effort you've been doing.

          I just would like to pay your attention that the productivity rates are in a big need to the crew structure producing these rates.

           

          Best Regards,

          Crew structure

          Thank you deeply, for the great effort you've been doing.

          I just would like to pay your attention that the productivity rates are in a big need to the crew structure producing these rates.

           

          Best Regards,

          Crew structure

          Thank you deeply, for the great effort you've been doing.

          I just would like to pay your attention that the productivity rates are in a big need to the crew structure producing these rates.

           

          Best Regards,

          Pluming Productivity rates

          Dear all experts,

           

          I need the productivity rates for first and second fixs for MEP work (HVAc, Firefighting and Plumbing).

           

          Thank you

          Pluming Productivity rates

          Dear all experts,

           

          I need the productivity rates for first and second fixs for MEP work (HVAc, Firefighting and Plumbing).

           

          Thank you

          Excel or PDF format of rates

          Good Morning,

           

          The information avaialble here is very useful for me, thanks a lot.

          I will be very thankful if excel file or PDF file of all prodcution rates can be shared on my email address: lnt.vikas@gmail.com

          Thanks,

          Vikas Budhiraja, PMP

          Productivity for Platform fabrication & installation

           

           

          Can anyone help me with the units used to measure progress of platfrom fabrication & welding?

           

          Is it ok to USE ... Kg of steel fabricated or welded?

          Productivity for Platform fabrication & installation

           

           

          Can anyone help me with the units used to measure progress of platfrom fabrication & welding?

           

          Is it ok to USE ... Kg of steel fabricated or welded?

          Partitions

          Hi Guys,

           

          Just like to know if we have productivity rate for glazing partitions..... also there is no productivity rate for plasterboard installation on the partitioning rates.

           

          Thanks!

           

          Ruel

          MEP Productivity Norms

           

          S.N0

          Activity

          Productivity norms

          Qty

          Units

          DUCTING:

          1

          Duct

          1.2 – 1.5

          Sqm/man/day

          2

          Insulation

          3

          Sqm/man/day

          3

          1 No - VAV

          3

          Sqm/man/day

          4

          1 No - ECV

          2

          Sqm/ man/day

          5

          1 No – Joint Insulation

          0.4

          Sqm/man/day

          6

          1 No - Flexible Duct

          1

          Sqm/man/day

          7

          1 No - Plenum

          1

          Sqm/man/day

          8

          1 No - MSFD

          2

          Sqm/man/day

          9

          1 No - VCD

          1

          Sqm/man/day

          10

          Pressure Test per 25 Sqm ducting

          4.5

          Sqm/man/ day

          11

          Multipurpose Supports – 4 No

          1.5

          Sqm/man/day

          12

          Grills & Diffusers

          6

          No’s / Man/ day

          13

          Linear Slot Diffuser

          6

          Rm / Man / day

           

          Kindly note that here ducting  is inclusive Support fixing + Cleat fixing + Sealant application

          CHW PIPE:

          1

          1" – 2" dia

          7.5

          Rm/man/day

          2

          2" - 3"dia

          5

          Rm/man/day

          3

          4"dia

          2.5

          Rm/man/day

          4

          6"dia

          1.5

          Rm/man/day

          5

          8"dia

          1.2

          Rm/man/day

          6

          10"dia

          1

          Rm/man/day

          7

          CHW Pipe Insulation

          15

          Rm/man/day

          8

          Pressure Test for 100 Rm

          3

          man/day

          9

          Valve Package

          1.5

          Man / day / unit

           

          Kindly note that here Chilled water piping is inclusive of Support fixing

          S.N0

          Activity

          Productivity norms

          Qty

          Units

          ELECTRICAL/ELV

          1

          Conduit

          16

          Rm/man/day

          2

          Wiring

          30-40

          Rm/man/day

          3

          Cable tray

          5-6

          Rm/man/day

          4

          Trunking

          8-10

          sq.m/man/day

          5

          DB Installation

          1

          Nos/man/day

          6

          DB Termination

          1

          Nos/man/day

          7

          Final Fix Accessories

          8

          Nos/man/day

          8

          Light points

          8

          Nos/man/day

          PLUMBING

          1

          Water supply pipe installation

          5

          Rm/man/day

          2

          Drain pipe installation

          3

          Rm/man/day

          Kindly note that Piping Installation is inclusive of Support fixing

          Middle East MEP Worker Production rate

          Hi all,

           

          I am also facing problem in sourcing MEP labout production rate for Middle East Region. Anyone can help?

           

          regards,

           

          Kevin

          Request for clarification....

          Hi Frendz ...

          I like this section this is helping me in may ways ..but i am facing problem when it comes to productivity rates given without resources, as what resource  should i consider if i want to use these rates please help .......

           

           

          regards,

          Khan

          Market Place

          For 25+ years, APMX has been providing competency based project management training to Fortune 500 companies around the world, applying the principles of project based learning, designed to produce measurable results, generating a favorable “return on training investment”.
          Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher and PMI accredited REP. Teach yourself using on-line or book based learning or run your own in-house or public PMI accredited courses.
          See how the TIME - LOCATION - VIEW brings clearness to your work programmes
          <small id="dga8l"><strong id="dga8l"></strong></small>
          <mark id="dga8l"><u id="dga8l"></u></mark>

          <listing id="dga8l"></listing>

            <small id="dga8l"></small>
          1. <mark id="dga8l"><ol id="dga8l"><dl id="dga8l"></dl></ol></mark>
            1. <output id="dga8l"></output>
              <mark id="dga8l"><ol id="dga8l"><dl id="dga8l"></dl></ol></mark>
              <label id="dga8l"></label>
              1. <code id="dga8l"></code>

                bet356亚洲版在线体育投注

                www.336688www.vwin

                彩七天乐

                星力手机打鱼游戏

                www凯时

                乐彩网购彩平台

                90vs比分足球

                环亚国际ag88

                九亿九彩票